Full Home Remodel in Redondo Beach: What to Expect, What It Costs, and How We Handle Everything

Remodeling your entire home is one of the biggest (and smartest) investments you can make—especially in Redondo Beach, where well‑executed renovations significantly increase both comfort and property value. Whether you’re updating an older beach‑area home or reworking a layout that no longer fits your lifestyle, a full home remodel allows you to do it right, all at once.

This guide breaks down what a full home remodel includes, what to expect during the process, realistic budget ranges for Redondo Beach, and how a full‑service team handles everything for you—from demo to final paint.

What Is Considered a Full Home Remodel?

A full home remodel typically involves renovating multiple major areas of the house at the same time, often including:

  • Kitchen remodel (cabinets, counters, layout, appliances)

  • Bathroom remodels (showers, tubs, tile, vanities, plumbing)

  • Removing or modifying structural walls

  • New flooring throughout the home

  • Interior painting and drywall work

  • Electrical and plumbing updates

  • Permits, inspections, and project management

Instead of hiring multiple contractors, a full‑service remodel means one team coordinates everything.

We Take Care of Everything (Start to Finish)

One of the biggest stressors homeowners face is managing different trades, schedules, and decisions. With a full home remodel, our role is to handle every phase so you don’t have to.

Our Full‑Service Process

1. Planning & Design
We start by understanding how you live in your home. Do you want an open kitchen? A larger primary bathroom? Better flow between rooms? We help plan layouts, finishes, and priorities before construction begins.

2. Permits & Structural Work
If walls are being removed or modified, we coordinate structural engineering, city permits, and inspections—critical in Redondo Beach.

3. Demo & Construction
Old kitchens, bathrooms, flooring, and walls are removed safely and efficiently. Structural changes are completed first, followed by rough plumbing and electrical.

4. Finishes & Installations
This is where the transformation happens:

  • Cabinets and countertops

  • Tile and flooring

  • Fixtures and lighting

  • Drywall, texture, and paint

5. Final Walkthrough & Punch List
We don’t wrap up until everything is finished, functional, and clean.

kitchen remodeling in redondo beach

Remodeling the Kitchen (The Heart of the Home)

In Redondo Beach homes, kitchens are often the biggest priority.

A full kitchen remodel may include:

  • Removing walls to create an open concept

  • New cabinets and layouts

  • Quartz or stone countertops

  • Updated electrical and lighting

  • New flooring tied into the rest of the home

Kitchen Remodel Budget Range (Redondo Beach):
$35,000 – $80,000+ depending on size, materials, and structural changes

Bathroom Remodels (Primary + Guest)

master bathroom tile to ceiling dual sink free standing tub glass door shower gold details redondo beach

Bathrooms are renovated at the same time for consistency and efficiency.

Common upgrades include:

  • Walk-in showers or tub conversions

  • Tile floors and shower walls

  • New vanities and plumbing fixtures

  • Improved ventilation and lighting

Bathroom Remodel Budget Range:
$18,000 – $35,000 per bathroom



Kitchen Remodel- Structural Wall Removal, Layout Change, Island Addition

Structural Walls & Layout Changes

Many Redondo Beach homes were built decades ago with closed-off layouts.

Removing or modifying structural walls can dramatically improve flow and natural light.

This work typically involves:

  • Structural engineering plans

  • City permits and inspections

  • Installing beams or supports

Structural Work Budget Range:
$8,000 – $25,000+ depending on scope



Flooring Throughout the Home

Replacing flooring at once creates a clean, cohesive look.

Popular options in coastal homes:

  • Engineered hardwood

  • Luxury vinyl plank (LVP)

  • Tile in kitchens and baths

Flooring Budget Range:
$8 – $20 per square foot installed

Interior Paint & Finishing Touches

Painting is usually the final phase and brings everything together.

Includes:

  • Wall and ceiling paint

  • Baseboards and trim

  • Drywall repair and texture

Interior Paint Budget Range:
$6,000 – $15,000 depending on size

What Does a Full Home Remodel Cost in Redondo Beach?

While every home is different, here are realistic budget ranges:

  • Small full remodel: $90,000 – $140,000

  • Mid-range full remodel: $140,000 – $220,000

  • High-end full remodel: $220,000 – $350,000+

Costs depend on:

  • Square footage

  • Number of bathrooms

  • Structural changes

  • Material selections

  • Age of plumbing and electrical

How Long Does a Full Home Remodel Take?

Typical timelines:

  • Planning & permits: 4–8 weeks

  • Construction: 10–20 weeks

Most full home remodels in Redondo Beach take 3–6 months from start to finish.

Why Remodel Your Entire Home at Once?

  • One timeline instead of multiple disruptions

  • Better design consistency

  • Lower overall cost vs. separate projects

  • Increased resale value

Ready to Remodel Your Redondo Beach Home?

If you’re considering a full home remodel—including kitchen, bathrooms, structural walls, flooring, and paint—working with a full-service team makes all the difference.

We manage the details, coordinate every trade, and guide you through each decision so you can focus on the end result: a home that finally works for you.

Contact us today to schedule a full home remodel consultation in Redondo Beach.

Previous
Previous

Home Remodeling in Rancho Palos Verdes: Structural Walls, Permits & Plans

Next
Next

Transform Your Bedroom: Remodeling Ideas for Palos Verdes & South Bay Homes